Inspection Status: Not Applicable
Inspection History: COT - RSOL - Electrical Underground Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 02/19/2026 |
COT - RSOL - Electrical Underground Solar Project |
|
Not Applicable |
|
| 02/19/2026 |
COT - RSOL - Electrical Underground Solar Project |
|
Partial Pass |
X3 1" schedule 40 at a depth of 18" to the top of the pipes. Approximately 5' trench. 1 is for the DC to Battery. 1 coming back to meter and disconnect. 1 for spare. Okay to backfill progress areas. Shading required. 2/19/2026 |
| 03/26/2026 |
COT - RSOL - Electrical Underground Solar Project |
|
Passed |
|