Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | BULD - Electrical Clearance | Passed | 06 FEB 25 TEP CLEARANCE: DGL |
|
| 03/13/2025 | BULD - Electrical Clearance | Passed | Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |