Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 1-29-25, gas line not under pressure. The city requires that the gas line be pressurized to 15psi for a minimum of 10 minutes.(use 15 gauge only)We must verify this requirement before clearance can be issued to Southwest Gas. | |
| 01/30/2025 | COT - RSPL - Plumbing Final | Passed | 1-29-25, gas line not under pressure. The city requires that the gas line be pressurized to 15psi for a minimum of 10 minutes.(use 15 gauge only)We must verify this requirement before clearance can be issued to Southwest Gas. 1/30/25: pressure test passed. Ok for meter tag. SWG CLEARANCE APPROVED. |