Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Underground
Permit Number - TC-RES-1124-06868
Inspection Description - COT - RSEL - Electrical Underground
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2025 | COT - RSEL - Electrical Underground | Re-inspection required | 15 March 25 1. UFER needs to extend above earth and ground connection needs be accessible after concrete is poured. At the current situation it will be covered by concrete. 2. Rebar must also separated 3" from earth. |
|
| 03/19/2025 | COT - RSEL - Electrical Underground | Partial Pass | Ufer corrected, Ok to place concrete | |
| 06/24/2025 | COT - RSEL - Electrical Underground | Passed | 6/24/25 Pass |