Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2025 | COT - RSEL - Electrical Underground | Re-inspection required | 15 March 25 1. UFER needs to extend above earth and ground connection needs be accessible after concrete is poured. At the current situation it will be covered by concrete. 2. Rebar must also separated 3" from earth. |
|
| 03/19/2025 | COT - RSEL - Electrical Underground | Partial Pass | Ufer corrected, Ok to place concrete | |
| 06/24/2025 | COT - RSEL - Electrical Underground | Passed | 6/24/25 Pass |