Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | BULD - Electrical Clearance | Re-inspection required | 6-10-25: panel is missing metallic address label. Note: after power is established, all breakers must be labeled for electrical final. |
|
| 06/12/2025 | BULD - Electrical Clearance | Not Applicable | 6-13-25: not applicable | |
| 06/13/2025 | BULD - Electrical Clearance | Passed | 6-13-25: panel okay to be energized. INCR clearance issued to TEP, however, contractor must submit an application to obtain activation. |