Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance was called into TEP at 11:15am Pending solar |
|
| 03/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter, DGL Clearance was called into TEP Pending solar |
|
| 03/26/2025 | BULD - Electrical Clearance | Passed | Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required |