Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2025 |
COT - RSOL - Electrical Final Solar Project |
|
Re-inspection required |
Failed - installation not per plan, wrong wire sizes from backfeed breaker to solar meter, also number of panel strings to roof |
| 01/15/2025 |
COT - RSOL - Electrical Final Solar Project |
|
Re-inspection required |
could not get in contact with Matt. |
| 01/17/2025 |
COT - RSOL - Electrical Final Solar Project |
|
Not Ready |
|