Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2026 | COT - RSEL - Electrical Underground | Re-inspection required | Conduit currently sits at 6 inches undergound. Line must be deeper or a revision that matches code must be made. | |
| 06/18/2026 | COT - RSEL - Electrical Underground | Passed | 06/18/2026 Corrections made to prior inspection, verified schedule 40 conduit depth. |
|
| 09/19/2025 | COT - RSEL - Electrical Underground | Re-inspection required | work is covered |