Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP at 10:40am Pending solar |
|
| 02/19/2025 | BULD - Electrical Clearance | Re-inspection required | 19 FEB 25 1. Missing PV warning labels throughout. 2. Breaker size not per plan. 3. Contractor could not get on roof for inspection. He didn't have a ladder. |
|
| 02/21/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |