Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 12/27/2024 | BULD - Electrical Clearance | Partial Pass | 12/27/24 Meter socket Adapter installed TEP verbal clearance code: DGL Partial pass pending solar. |