Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2025 |
BULD - Electrical Clearance |
|
Canceled |
1/9/25 canceled. According to the property has trees that need to be removed before continuing. Once that is finished they will reschedule the inspections. Please call if you have questions. |
| 02/11/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial approval for a 200A service panel upgrade, INCR Clearance was called into TEP. (Note plans show a 125A upgrade) |
| 02/24/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved - DGC Clearance to TEP is required for the solar meter |