Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 150A service panel upgrade, INCR Clearance was called into TEP Pending solar |
|
| 04/04/2024 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT Clearance to TEP is required for the soar meter and battery installation |