Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-1123-09779

Parcel: 11804091A

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
07/15/2024 RSBU - Building Final  Not Ready 7/15/24: roof nailing passed ok to dry-in
08/21/2024 RSBU - Building Final  Re-inspection required 7/15/24: roof nailing passed ok to dry-in
8/21/24: Attic light and receptacle not made up, A/C condenser must have refrigerant lines UV protected, lock out caps required at condenser, thermostat wire must be protected from elements, A/C disconnect missing cover plate, bedroom closet missing light fixture, air handler must have NM cable secured 12" from box, wiring at disconnect box for air handler is a code violation.
08/22/2024 RSBU - Building Final  Passed all items completed