Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2023 | RSBU - Building FinalĀ | Passed | New solar panels are installed. Disconnect and inverter is properly wired. All required labels are on equipment. Okay to energize system. |