Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2026 | RSBU - Building Final | Passed | 03/17/2026 Approved. All corrections made to prior inspection. |
|
| 11/07/2025 | RSBU - Building Final | Re-inspection required | 11-7-25: paint/seal all exterior wood, plastic bushings are required at ends of each raceway, nm cabling is not allowed for damp/wet locations |