Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 02/10/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
unland all wires to breakers and wire nut all circuit wires. Circuit to GFCI outlet at panel ok to keep connected. |
| 02/16/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
2nd failed inspection. Unland all wires to breakers and wire nut all circuit wires. Circuit to GFCI outlet at panel ok to keep connected. |
| 03/22/2023 |
BULD - Electrical Clearance |
|
Re-inspection required (with fee) |
March 22nd: This is the 3rd failed inspection for temporary power. Unland all wires to breakers and wire nut all circuit wires. Circuit to GFCI outlet at panel OK to keep connected. Pay re-fee before scheduling next inspection |
| 03/27/2023 |
BULD - Electrical Clearance |
|
Passed |
TEP TEC |