Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2023 | COT - RSEL - Electrical Final | Re-inspection required | Denied - plans require 225A Bus rating for 60A backfeed | |
| 05/04/2023 | COT - RSEL - Electrical Final | Not Ready | 5/4/23- ELECTRICAL FINAL WILL BE RESCHEDULED | |
| 05/10/2023 | COT - RSEL - Electrical Final | Passed | Denied - plans require 225A Bus rating for 60A backfeed 5/4/23- ELECTRIC FINAL WILL BE RESCHEDULED 5/10/23: INCR. good to go. Solar DGC good to go as well. |