Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2023 | BULD - Electrical Clearance | Partial Pass | Partial- INCR Clearance was called into TEP at 12:45pm (power-kill) | |
| 02/27/2023 | BULD - Electrical Clearance | Re-inspection required | Denied - plans require 225A Bus rating for 60A backfeed | |
| 05/04/2023 | BULD - Electrical Clearance | Partial Pass | 5/4/23- INCR VERBAL CLEARANCE TO TEP @2:01pm 5/4/23- PV CLEARANCE NOT READY |
|
| 05/04/2023 | BULD - Electrical Clearance | Passed | Partial- INCR Clearance was called into TEP at 12:45pm (power-kill) 5/4/23- INCR VERBAL CLEARANCE TO TEP @2:01pm |
|
| 05/10/2023 | BULD - Electrical Clearance | Passed |