Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2023 | RSBU - Building Final | Re-inspection required | called multiple times and left a voicemail. all of the foundation supports have been backfilled. |
|
| 04/10/2023 | RSBU - Building Final | Passed | Contractor has installed footings piers as per architect's drawings. All excavation for piers has been backfilled and compacted. Project is completed. |