Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSME - Mechanical FinalĀ 

Date Description Inspector Results Comments
10/09/2026 COT - RSME - Mechanical FinalĀ  Re-inspection required Furnace requires clamp at wire into unit or plastic grommet. Ensure wire is at least a 1/4" inside point of connection. Jacket on wire is damaged. Seal ductwork. Support line sets in crawl space 4' o.c. Secure t stat wire due to contact to earth throughout all of run. 10/9/2026