Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2026 | RSBU - Building Final | Re-inspection required | 1.14.26 New GFCI circuits in kitchen and bathroom require arc fault breakers. 3 prong outlets that have been replaced into other general areas with existing circuits need to be GFCI outlets and marked as no grounding equipment, or replaced with like for like 2 prong per IRC/NEC Water heater has been replaced without permit New circuits feeding kitchen and bathroom have been replaced outside of permitted work |
|
| 03/03/2026 | RSBU - Building Final | Passed |