Inspection Status: Not Ready
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - RSME - Mechanical Final | Not Ready | 02/09/2026 Not ready. Call in at final. |
|
| 04/03/2026 | COT - RSME - Mechanical Final | Re-inspection required | 4/3/26 1. Water heater not installed yet. 2. Drain for HVaC is loose and needs to terminate at the ground. 3. HVAC return is too small needs to be 30x30 per plan. 4. T-stat too high 48" maximum. |
|
| 05/05/2026 | COT - RSME - Mechanical Final | Passed | Passed 5/5/26 |