Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSPL - Plumbing Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2025 | RSPL - Plumbing Progress | Partial Pass | partial pass. 2” P.E pipe in place at 22” depth. From meter location to new riser location . okay to backfill progress areas. shading required. pending new black iron to be ran. main water line from meter location to new riser location. 18” depth. okay to backfill progress areas. shading required. water line underneath crawl space has to be secured every 32” horizontally and insulated. 10/24/2025 |
|
| 10/31/2025 | RSPL - Plumbing Progress | Passed | 10.30.25 ok to proceed |