Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2-25-26: pictures provided & approved for reinforcement at slab on grade. Fire foam all penetrations at top plates, missing smoke detector in bedroom and in the adjacent room, replace 14/2 wag wires with 12/2 wires, and have architect submit a letter showing 2x4 studs at 24" o.c. | |
| 03/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 3.23.26 Partial pass pending documentation on studs, ok to proceed at own risk |
|
| 05/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5-26-26: residential intermediates approved. |