Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel w/ 100A main - INCR Clearance was called into TEP at 12:50pm Pending solar |
|
| 03/05/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |