Inspection Status: Passed

Inspection History: COT - RSBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
06/23/2025 COT - RSBU - Excavation/Rebar/Zoning  Passed 6-23-25: reinforcement verified per plans. Okay to pour concrete.
06/23/2025 COT - RSBU - Excavation/Rebar/Zoning  Re-inspection required 6-23-25: provide 3" clearance throughout pad. Reinforcement from earth must maintain a 3" clearance. Several areas measured at 1 3/4" -2"- provide larger blocks throughout.