Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | BULD - Electrical Clearance | Passed | 3/13/25 partial passed pending solar CLEARANCE INCR called Marcia 1:53 to restore power | |
| 04/07/2025 | BULD - Electrical Clearance | Passed | ||
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4/25/25 TEP CLEARANCE: DGL, Tesla backup switch. Called TEP @ 9:53. |
|
| 06/24/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |