Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
04/03/2025 BULD - Electrical Clearance Re-inspection required Both Risers need to be either rigid metal conduit or schedule 80. 4/3/2025
04/04/2025 BULD - Electrical Clearance Re-inspection required 4-4-25, see previous notes. Also,provide a moisture barrier behind the sub panel/panel #2.
04/10/2025 BULD - Electrical Clearance Passed 400 amp panel to serve both units. Ok to set meter for service.