Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 02/03/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
2/3/24 partial pass. DWV not under test. Bathroom electrical not complete. Fire blocking required at penetrations. Re inspection required before drywall goes up. |
| 02/10/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
2/10/25: Passed--DWV is under test, bathroom electrical is complete, spray foam applied at all top plate penetrations, and rough-in is complete for mechanical, electrical, and plumbing. Okay to proceed with installation of insulation and drywall. |