Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-1024-06123

Parcel: 134080110


Addresses:

712 S KENYON CT

Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 2/3/24 partial pass. DWV not under test. Bathroom electrical not complete. Fire blocking required at penetrations. Re inspection required before drywall goes up.
02/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/10/25: Passed--DWV is under test, bathroom electrical is complete, spray foam applied at all top plate penetrations, and rough-in is complete for mechanical, electrical, and plumbing. Okay to proceed with installation of insulation and drywall.