Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2025 |
RSBU - Building Final |
|
Re-inspection required |
Provide hammer arrestor on hot line for dishwasher. Add vacuum breaker at hose bib. Insulate exterior water line. Add Tmp line for water heater. Dialectical fitting has to be in place at point of connection to water heater for dissimilar metals also at flex line. Plans call for 3/4 water lines. 1/2 is in place reducing water pressure. Add seal tight to electrical lines at disconnect. Secure disconnect mc cable. Add gfci receptacles to all wet locations. Re label panel. Receptacle in hall is not working. 5/2/2025 |
| 05/19/2025 |
RSBU - Building Final |
|
Passed |
|