Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2025 | RSBU - Building FinalĀ | Re-inspection required | 10 Mar 25 1. Clips/sheating was not requested, before final. 2. Contractor must provide engineer letter stating all work was completed per 2018 IRC standards and or provide photos of details from plan. |