Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | BULD - Electrical Clearance | Re-inspection required | 10/31/24: No answer. Sent message at 8am. | |
| 11/01/2024 | BULD - Electrical Clearance | Not Ready | 10/31/24: No answer. Sent message at 8am. 11/1/24: partial for grounding only. |
|
| 12/03/2024 | BULD - Electrical Clearance | Passed | 12/3/24 clearance for TEP: INCR increase from 100amp to 200amp panel |