Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-1024-05932

Parcel: 120030470


Addresses:

1131 W COLUMBIA ST

Inspection Status: Partial Pass

Inspection History: COT - RSEL - Grounding/Bonding 

Date Description Inspector Results Comments
01/21/2026 COT - RSEL - Grounding/Bonding  Partial Pass 1-21-26: plans show an electrical upgrade from 100 to 200amp service but Customer advised he is going to stay with 100 amp service. I informed him that a revision must be submitted to the city stating this. Gas bonding was also looked at and corrections stemming from inspection on 7/31/25 were made.
01/29/2026 COT - RSEL - Grounding/Bonding  Partial Pass 1-29-26: grounding/bonding at 100 amp service & at gas approved.
Note: pending city approval regarding revision of 100 amp service panel -See previous notes.
02/28/2025 COT - RSEL - Grounding/Bonding  Re-inspection required Failed, 2 ground rods with #4 copper grounding conductor is required, water and gas pipe bonding is required
04/09/2025 COT - RSEL - Grounding/Bonding  Not Ready
07/31/2025 COT - RSEL - Grounding/Bonding  Re-inspection required 7.31.2025: Gas & water needs continuous #4 CU wire jumper to properly ground/bond utilities, currently wire is cut at gas meter to metal hose bib.