Inspection Status: Partial Pass
Inspection History: COT - RSEL - Grounding/Bonding
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | COT - RSEL - Grounding/Bonding | Partial Pass | 1-21-26: plans show an electrical upgrade from 100 to 200amp service but Customer advised he is going to stay with 100 amp service. I informed him that a revision must be submitted to the city stating this. Gas bonding was also looked at and corrections stemming from inspection on 7/31/25 were made. | |
| 01/29/2026 | COT - RSEL - Grounding/Bonding | Partial Pass | 1-29-26: grounding/bonding at 100 amp service & at gas approved. Note: pending city approval regarding revision of 100 amp service panel -See previous notes. |
|
| 02/28/2025 | COT - RSEL - Grounding/Bonding | Re-inspection required | Failed, 2 ground rods with #4 copper grounding conductor is required, water and gas pipe bonding is required | |
| 04/09/2025 | COT - RSEL - Grounding/Bonding | Not Ready | ||
| 07/31/2025 | COT - RSEL - Grounding/Bonding | Re-inspection required | 7.31.2025: Gas & water needs continuous #4 CU wire jumper to properly ground/bond utilities, currently wire is cut at gas meter to metal hose bib. |