Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2024 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
10/15/24: valves under sink in kitchen and master bedroom need to be securely fastened to wall. Penetrations in top plate need to be fire foamed in garage at water heater and master bedroom closet and master bedroom for exterior hose bib. Back yard hose bib needs insulation. |
| 10/16/2024 |
COT - RSPL - Plumbing Final |
|
Passed |
10/16/24: Valves and pipes are properly secured under sink in kitchen and master bathroom. All penetrations have been foamed in top plates, and exterior hose bibs have been insulated. Okay to proceed with patching and painting walls. |