Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2024 |
BULD - Electrical Clearance |
|
Passed |
Approved, corrections were addressed, DGC/DGL Clearance to TEP is required for the solar meter |
| 12/13/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
|
| 12/29/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
Not ready. Inverter does not match the set of plans. Revise breaker inside main panel. 12/29/2023 |