Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
Denied, the 60A MSA meter collar is not per the approved plans (30A), please revise or change installation |
| 02/01/2024 |
BULD - Electrical Clearance |
|
Passed |
Approved, DGC Clearance to TEP is required for the solar meter (DGL) |
| 12/18/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
12/18/23 DGL for future solar |