Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the tesla meter collar, DGL Clearance was called into TEP Pending solar |
|
| 02/20/2024 | BULD - Electrical Clearance | Passed | Approved, BAT Clearance to TEP is required for the installation of batteries |