Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap, DGL Clearance was called into TEP at 1:55pm Pending solar |
|
| 03/01/2024 | BULD - Electrical Clearance | Passed | Approved, DGC/DGL Clearance to TEP is required for the solar meter |