Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved with 60A meter adapter - DGC/DGL Clearance to TEP is required for the solar meter |
| 11/14/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
Panels not installed per plan, need revised plans or panels moved to proper configuration |
| 12/16/2024 |
BULD - Electrical Clearance |
|
Not Ready |
|