Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
Permit Number - TC-RES-1023-08816
Inspection Description - BULD - Electrical Clearance
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/01/2024 | BULD - Electrical Clearance | Re-inspection required | Tech that was the contact Kyle (706)306-6860 said Eric (520)449-0487 was the tech assigned, messaged Eric with no response. | |
02/06/2024 | BULD - Electrical Clearance | Partial Pass | 2/6/24 - Clear INCR for cutover scheduling. Clear DGC for solar. Partial pass for use with cutover reconnect clearance. |
|
03/15/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
03/21/2024 | BULD - Electrical Clearance | Not Applicable | NA. - this is a duplicate inspection | |
BULD - Electrical Clearance | Passed | Solar complete. CLEAR DGC |