Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter collar, DGL Clearance was called into TEP at 10:20am | |
| 11/28/2023 | BULD - Electrical Clearance | Passed | 11/28/23 - Approved, DGC/DGL Clearance to TEP is required for the solar meter 12/22/23 clearance resent |