Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | ENGR Engineering Final | Passed | ||
| 11/13/2025 | ENGR Engineering Final | Passed | 11/13/25 ADU needs Accessible Route per the Inclusive Home Ordinance. Pavers set in concrete, 4" concrete sidewalk or Stabilized DG is acceptable for the route from driveway, street or sidewalk. Route also must meet Exit of ADU at Finish Grade. Notes are on page one of Approved plans. |