Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical FinalĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2026 |
COT - RSME - Mechanical FinalĀ |
|
Re-inspection required |
10-27-26 provide 3 inch clearance around condensing pad on all four sides* unit at attic drainage secondary is required to be properly sloped to provide proper drainage section 1411.9* Redwood is not a listed method for securing air handler |