Inspection Status: Not Ready
Inspection History: RSME - Mechanical Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2025 |
RSME - Mechanical Progress
|
|
Not Ready |
Revise set of plans. P.E line has been installed from meter to new riser location. Plans state all black iron pipe is the new install. Leave trench open to verify proper depth at time of inspection. Re pressurize line at time of inspection. 10/23/2025 |
| 10/30/2025 |
RSME - Mechanical Progress
|
|
Passed |
|