Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| RSBU - Building Final | Re-inspection required | 1. GFCI needed in bathroom, failed test with GFCI Tester. 2. Mini split fuse needs to be 20A max. 3. Water hammer arrestor needed at laundry. 4. Post on the North east is very loose. |
||
| 10/14/2026 | RSBU - Building Final | Passed | 10/14/2026 Approved. All corrections were made. |