Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCEL - Electrical Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2025 | COT - LCEL - Electrical Progress | Passed | 2 1/2' schedule 40 at 30" depth. From new service location to the house panel. (Becoming a sub panel at main.) 1" along with 3/4" is for solar interfase at the new main location. Okay to backfill progress areas. Shading required. 10/29/2025 |