Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | BULD - Electrical Clearance | Passed | 12/12/2025 Clearance to TEP DGC/DGL/BAT at 11:15am. Verbal on-site for Tesla backup switch. |