Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | BULD - Electrical Clearance | Passed | Passed 1/15/26 READY FOR CUTOVER CLEARANCE INCR | |
| 01/28/2026 | BULD - Electrical Clearance | Passed | 01/28/2026 Clearance TEP INCR for 200A MPU cutover. Main panel with meter is moved outside and subpanel remains inside. Clearance for cutover passed 1/15/26. |