Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-2-26: called point of contact at 815am but received no answer. Arrived on site at 830 am, waited for call back until 840am. Submit a revision for mechanical, pex lines and framing and include, exterior wall type, anchor bolts and shot-pins. Exterior lath must inspected and approved prior to intermediates. | |
| 01/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 01/12/2026 Verified received latest revision. T1-11 siding and vapor barrier, z-bar in place to separate wall from concrete contact on outside, anchor bolts verified. Verified mechanical, electrical, and plumbing under test. Okay to proceed, verify shower pan under test before calling in finals. |
|
| 01/20/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-20-26: verified shower liner under test. Okay to continue with construction at progress areas. | |
| 12/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 12/17/2025 Not ready. |