Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | BULD - Electrical Clearance | Passed | Approved with line-side tap - DGC/DGL Clearance to TEP is required for the solar meter |